How the Intel Pack is made
One page, kept current, for anyone who wants to check how a number in the pack was produced.
Last changed: 14 November 2026. Changes to this page are listed at the bottom, with the date of each.
What the pack is for
Every week a supplier asks three things: which projects are worth a conversation, what has changed to make that conversation timely, and where equipment and crews may be needed. The Intel Pack gives you the public record to answer them. It does not answer them for you.
Where the data comes from
The pack is built from one source: British Columbia's public Notice of Work record, published in the BC Data Catalogue under the Open Government Licence – British Columbia. A Notice of Work is the application for a permit to do exploration or placer work under the Mines Act.
BCMI does not control that record. If BC changes it or stops publishing it, the pack changes or stops with it.
Why a daily copy matters
BC's feed shows each application as it stands today. When an application changes, the feed is updated and the earlier state is no longer shown. The feed has no history.
BCMI captures the whole feed every morning and keeps each captured version. Daily capture began on 11 August 2026. From that date, BCMI can show when an application appeared, when its status changed, and when a work start or stop date was filed or changed. Before that date, BCMI holds one snapshot of each application as it stood when capture began, not a record of how it got there.
How to read the dates
- Every number in a pack shares one capture date. It is printed on the cover and in every footer. Every window in the pack ends on that date.
- A change is dated by when BCMI saw it. BCMI knows a change happened between two captures. When those captures are a day apart, the pack gives the day. When they are further apart, the pack gives the window, not a single day.
- Dates that BC records itself are shown as BC recorded them. The submission date is an example.
- A capture date is not an event date. “Seen on” means the morning BCMI's copy first showed the change.
- Approvals are the one case where the two can be compared. BC records its own issue date for an approval. From the start of capture to mid-November 2026, about nine approvals in ten appeared in BCMI's copy the morning after BC's issue date. For other status changes BC records no date of its own, so the day BCMI saw the change is the only date there is.
What BC calls a mine
BC's record gives every permitted site a mine number and a mine name, whether it is an exploration camp, a placer claim or an established mine. The pack uses BC's word. In practice the live record falls into three groups:
- Mineral exploration. A mineral application at a regional mine site. This is hard-rock exploration: drilling, trenching, camps and access.
- Placer operations. A placer application. Gold recovered from gravels, mostly small and seasonal.
- Exploration at a major mine site. A mineral application at a site BC classes as a major mine.
The record has no field that says whether a site is producing. BC's operating-status field is not used for that purpose in the pack, because it reads as operating for many exploration and placer sites.
What a filing is, and is not
A filing is what the applicant told BC: a proposed activity, a hectare figure, a planned work window. It is declared, not observed. It is not a record of what happened on the ground, and it is not a contract that is available to bid on.
Definitions
Live filing. Status Received, Referred, Referral Complete or Approved, and submitted within twelve months of the capture date. A filing submitted more than twelve months before the capture date is not counted as live, even if BC has not yet decided it. Changes to it, including approvals, are still reported.
Queue. Live and not yet approved.
Referred. BC's status for consultation and referral to agencies, stakeholders and First Nations. Referral Complete means that step is finished and government acts next.
Client Delayed. BC's status when the applicant must provide more information or reclamation security. It is not counted as live. It says whose move it is, not who caused the wait.
Drilling, camp, access. A filing that declares a proposed area above zero for that activity.
Full field program. A live filing that proposes drilling, a camp and access together, each with a declared area above zero. Some amendments in the public record carry dates only and no hectares, so they are never counted as full field programs.
Work start date. The date the permit holder told BC that on-site work is due to begin. Many live sites have none on file, so the absence of a date does not mean no work is planned.
Permit status. A site's state on its latest filing: latest filing pending; permitted with no current start notice; or current start notice, meaning a work start date in the last twelve months that has arrived, with no stop date passed. Pending does not mean there is no permit: an amendment changes an existing one.
Approval days. BC's issue date minus submission date, in calendar days.
Counted by BCMI. A figure computed from the record, not read from a single field: approval durations, declared activity, full field programs, permit status. These are marked in the pack. Each is checked against its source when the pack is built, and a failed check stops the build.
Two clocks for approval times
BC set target times of 40, 90 and 140 days for its three tiers of application, from 1 April 2026. BC's clock starts when an application is accepted and pauses while it is with the applicant. BCMI counts calendar days from submission and does not pause. Both are true, and BCMI's figure always reads higher. The pack shows both and says which is which.
The summary in each email
Each pack email opens with a short summary for the seven days ending on the capture date: approvals, new filings, declared work start dates filed or changed, and the live total.
It then sets each region beside its own recent weeks: the number of changes seen that week, with the average of the four weeks before in brackets, and the number of live full field programs. A change here means a status move or a new filing. Changes to work start dates are counted separately.
The summary gives counts only. It uses no percentages, because the weekly counts are small and a percentage would overstate them. It makes no comparison that the reader cannot check against the pack.
How to use the pack
| Step | What the pack contributes | What you do |
|---|---|---|
| Review the week | Shows which records changed, where, and to what stage | Scan for permittees, mines and regions relevant to your business |
| Assess relevance | Provides the declared program details and the captured history of the record | Apply your knowledge of your capabilities, relationships, operating territory and availability |
| Choose follow-ups | Shows that a record changed and when BCMI saw it | Decide whether that change is a useful reason to contact someone |
| Check the facts | Provides the public-record starting point | Ask about actual plans, contractor selection, timing and requirements |
| Make commitments | Does not forecast or recommend commitments | Decide whether to quote, visit, reserve capacity or take no action, based on what you then establish |
What the pack does not cover
- Environmental assessments and major mine permits. These are held in other registries. A project can be in the pack for its exploration permits while a much larger proposal for the same ground is being reviewed elsewhere, and the pack will not show it.
- Mineral and placer claims. A Notice of Work is a permit to do work. It is not a record of who holds the ground.
- Contractor relationships, bids and contract values. Not part of the filing.
- Who is hiring, and what services a program will buy. Filings describe the work proposed, not the suppliers it needs.
- Ownership, financing and ratings. Not in the government record, and BCMI does not add them.
What the pack does not assume
BCMI reports what the public record says and what can be counted from it. It does not assume that an approved filing was built, that a site with no current start notice is idle, that a Client Delayed file has stopped, or that a declared area was disturbed. Where the record is silent, the pack says so. Nothing in the pack is investment, legal or permitting advice.
Names and locations
Mine and permittee names appear only in what is sent to subscribers. A private individual who holds a permit is never named. Coordinates and permit numbers are not included in any pack, list or page.
Corrections
When something on this page or in a pack is found to be wrong, BCMI adds a dated correction and leaves the original text in place, so a reader can see what changed and when. To report an error: inquiries@bcminingintel.com
Changes to this page
- 14 November 2026. Page published.