BCMI · BC Mining Intelligence

How the Intel Pack is made

One page, kept current, for anyone who wants to check how a number in the pack was produced.

Last changed: 14 November 2026. Changes to this page are listed at the bottom, with the date of each.

What the pack is for

Every week a supplier asks three things: which projects are worth a conversation, what has changed to make that conversation timely, and where equipment and crews may be needed. The Intel Pack gives you the public record to answer them. It does not answer them for you.

Where the data comes from

The pack is built from one source: British Columbia's public Notice of Work record, published in the BC Data Catalogue under the Open Government Licence – British Columbia. A Notice of Work is the application for a permit to do exploration or placer work under the Mines Act.

BCMI does not control that record. If BC changes it or stops publishing it, the pack changes or stops with it.

Why a daily copy matters

BC's feed shows each application as it stands today. When an application changes, the feed is updated and the earlier state is no longer shown. The feed has no history.

BCMI captures the whole feed every morning and keeps each captured version. Daily capture began on 11 August 2026. From that date, BCMI can show when an application appeared, when its status changed, and when a work start or stop date was filed or changed. Before that date, BCMI holds one snapshot of each application as it stood when capture began, not a record of how it got there.

How to read the dates

What BC calls a mine

BC's record gives every permitted site a mine number and a mine name, whether it is an exploration camp, a placer claim or an established mine. The pack uses BC's word. In practice the live record falls into three groups:

The record has no field that says whether a site is producing. BC's operating-status field is not used for that purpose in the pack, because it reads as operating for many exploration and placer sites.

What a filing is, and is not

A filing is what the applicant told BC: a proposed activity, a hectare figure, a planned work window. It is declared, not observed. It is not a record of what happened on the ground, and it is not a contract that is available to bid on.

Definitions

Live filing. Status Received, Referred, Referral Complete or Approved, and submitted within twelve months of the capture date. A filing submitted more than twelve months before the capture date is not counted as live, even if BC has not yet decided it. Changes to it, including approvals, are still reported.

Queue. Live and not yet approved.

Referred. BC's status for consultation and referral to agencies, stakeholders and First Nations. Referral Complete means that step is finished and government acts next.

Client Delayed. BC's status when the applicant must provide more information or reclamation security. It is not counted as live. It says whose move it is, not who caused the wait.

Drilling, camp, access. A filing that declares a proposed area above zero for that activity.

Full field program. A live filing that proposes drilling, a camp and access together, each with a declared area above zero. Some amendments in the public record carry dates only and no hectares, so they are never counted as full field programs.

Work start date. The date the permit holder told BC that on-site work is due to begin. Many live sites have none on file, so the absence of a date does not mean no work is planned.

Permit status. A site's state on its latest filing: latest filing pending; permitted with no current start notice; or current start notice, meaning a work start date in the last twelve months that has arrived, with no stop date passed. Pending does not mean there is no permit: an amendment changes an existing one.

Approval days. BC's issue date minus submission date, in calendar days.

Counted by BCMI. A figure computed from the record, not read from a single field: approval durations, declared activity, full field programs, permit status. These are marked in the pack. Each is checked against its source when the pack is built, and a failed check stops the build.

Two clocks for approval times

BC set target times of 40, 90 and 140 days for its three tiers of application, from 1 April 2026. BC's clock starts when an application is accepted and pauses while it is with the applicant. BCMI counts calendar days from submission and does not pause. Both are true, and BCMI's figure always reads higher. The pack shows both and says which is which.

The summary in each email

Each pack email opens with a short summary for the seven days ending on the capture date: approvals, new filings, declared work start dates filed or changed, and the live total.

It then sets each region beside its own recent weeks: the number of changes seen that week, with the average of the four weeks before in brackets, and the number of live full field programs. A change here means a status move or a new filing. Changes to work start dates are counted separately.

The summary gives counts only. It uses no percentages, because the weekly counts are small and a percentage would overstate them. It makes no comparison that the reader cannot check against the pack.

How to use the pack

StepWhat the pack contributesWhat you do
Review the weekShows which records changed, where, and to what stageScan for permittees, mines and regions relevant to your business
Assess relevanceProvides the declared program details and the captured history of the recordApply your knowledge of your capabilities, relationships, operating territory and availability
Choose follow-upsShows that a record changed and when BCMI saw itDecide whether that change is a useful reason to contact someone
Check the factsProvides the public-record starting pointAsk about actual plans, contractor selection, timing and requirements
Make commitmentsDoes not forecast or recommend commitmentsDecide whether to quote, visit, reserve capacity or take no action, based on what you then establish

What the pack does not cover

What the pack does not assume

BCMI reports what the public record says and what can be counted from it. It does not assume that an approved filing was built, that a site with no current start notice is idle, that a Client Delayed file has stopped, or that a declared area was disturbed. Where the record is silent, the pack says so. Nothing in the pack is investment, legal or permitting advice.

Names and locations

Mine and permittee names appear only in what is sent to subscribers. A private individual who holds a permit is never named. Coordinates and permit numbers are not included in any pack, list or page.

Corrections

When something on this page or in a pack is found to be wrong, BCMI adds a dated correction and leaves the original text in place, so a reader can see what changed and when. To report an error: inquiries@bcminingintel.com

Changes to this page

Contains information licensed under the Open Government Licence – British Columbia.